Building appraisal by M Higgins of SCC. Three phases of construction were identified: a two-bay parlour range with crown-post roof, originally jettied to the front and right and perhaps of mid/late 15th century date, and associated with a lost hall house. The second phase, probably dated to the late 15th century, comprised a three-bay open hall range, two bays of which were originally open to the roof, with gabled crown strut and unusual roof trusses with double side purlins.